Alt Information
  
Grading

Stripping of your site prior to commencing construction including stockpiling topsoil occurs on some projects and is usually completed with our dozers.

Rough grading normally occurs after the completion of your foundation as it is imperative that proper drainage be maintained during construction to assist with the run off of surface water.

Final grading normally occurs prior to landscaping and installation of sod or seeding of your lawn.  Accuracy in grading is important to provide you with proper drainage and flow of natural storm water.  Our operators are highly experienced and strive to ensure your completion of your project is right. We provide the right equipment for every job from a small 4 foot Skid Steer to a D5 Dozer.

 
 


Copyright © 2012 Cotton Inc. | Privacy Statement | Contact Us